• Home

Stonewerks.net

A blog from Grand Rapids, Michigan

Feed on
Posts
Comments
« Orange Water
New AC »

New Office Window In

Jul 25th, 2009 by stone

Old Window
New Window In

I have never put in replacement windows so I only order just one window to test this process out. I went with the one that would be the most difficult to replace because I am going from a slide window to a double hung window. Today we put it in. It took about two hours to get the window in and that is because the window was a bit short and I had to build out the frame to fit the window better. We also took our time to make sure every thing lined up perfect and then I added insulation all the way around the the window frame to make it as energy efficient as I could. Once in place, caulked around the window to keep the water out and now I have to order more trim so I can trim in the window.

The window was cake. I will order the other slider replacement in a slightly larger size so that it fits better and then I will add one of the double hung replacements and see if that fits perfectly before I order the others. I have 8 more windows and one sliding door to go. Once I get these windows it won’t take too long to get them all installed and much more pleasant this winter with modern energy efficient windows.

The windows are of high enough energy savings level that they qualify for the Obama tax credit so with the windows and the extra insulation that we are going to put in the attic we should be able to get all of the tax credits the President has put out there for us. So thank you Mr. President, I needed to do these updates anyway and you are helping me pay for them!

Posted in Home

3 Responses to “New Office Window In”

  1. on 27 Jul 2009 at 8:07 am1Jeanne

    Glad to hear that it went well. It looks great.

  2. on 27 Jul 2009 at 5:19 pm2mom-gramma

    Good job ,you two!!!!

  3. on 28 Jul 2009 at 10:35 am3morgajel

    ya know, I have some windows that need replacing as well… any volunteers? no? oh well.

  • Recent Posts

    • Pure Michigan
    • The Fair
    • Saturday Night Race
    • Ouch
    • Finishing It Off
    • Finishing Touches
  • September 2010
    S M T W T F S
    « Aug    
     1234
    567891011
    12131415161718
    19202122232425
    2627282930  
  • Six Months of Archives

    • September 2010 (1)
    • August 2010 (14)
    • July 2010 (23)
    • June 2010 (17)
    • May 2010 (3)
    • April 2010 (2)

Stonewerks.net © 2010 All Rights Reserved.


This blog is protected by Dave's Spam Karma 2: 81462 Spams eaten and counting...